![how do students get a working copy of kappa saphir how do students get a working copy of kappa saphir](https://img.yumpu.com/43914979/1/184x260/the-analysis-of-dynamic-data-in-shale-gas-reservoirs-kappa.jpg)
Well testing can also be carried out during the production stage of a well in order to monitor reservoir and well performance as well as understand causes of deviation in performance. Information obtained in this stage helps in the design of production and completion facilities. It is the last step of evaluation before a well is produced. Well testing can be done during the exploration or appraisal stage for reservoir characterization. Well tests are carried out as a form of formation evaluation to provide confirmation and detailed fluid properties, ability of the formation to produce and accurate pressure measurements. 3.3.1 Data requirement for the PTA to achieve the above objectivesĬhapter Five Conclusion And Recommendation.1.1.3 Uses of Bottom-hole pressure test Derived Information.Well property such as bottom-hole flowing pressure was calculated using the results obtained from the analysis. Further studies were made to ascertain the effect of stimulation on the damaged wells and significant gain in barrels produced were observed. The highly damaged well was recommended for stimulation and the rest was recommended to have future plans for stimulation. It was seen that one well has undergone a successful stimulation and the other three damaged with one of them severely damaged.
![how do students get a working copy of kappa saphir how do students get a working copy of kappa saphir](https://www.kappaeng.com/images/LSN/BgLSNAzurite.png)
pressure, permeability and boundary conditions. The result from tool showed the properties of the reservoir required for characterization i.e. In this study, a build-up test data was obtain from an XYZ field for two dual string oil producing wells (4 wells) and was analyzed using a tool called Saphir.
#HOW DO STUDENTS GET A WORKING COPY OF KAPPA SAPHIR MANUAL#
There are various methods used to analyze well test data such as manual plotting, excel analysis and software analysis. The results required from the tests cannot be directly obtained from the well test data. Obtaining relevant data in order to characterize a reservoir and determine initial pressure is a major objective of a build-up test. In this study, build-up test was the main focus. The objective for a well test determines the type and design to be carried out. Well testing provides a means of obtaining information about the well and the reservoir as well as diagnosing a problem if any is present. Just as a regular medical checkup is advised for humans so is well testing advised for a target formation. One of the essential part of monitoring is well testing. Monitoring and maintenance is a continuous process in the various phases of a well’s life.
![how do students get a working copy of kappa saphir how do students get a working copy of kappa saphir](https://eldemuz.com.ng/wp-content/uploads/2020/10/sapir.jpg)
Project and Seminar Material for Petroleum Engineering